Isolo Power Gen Limited has secured approval to develop a 9MW embedded power generation project in Lagos State under the latest licensing round issued by the Lagos State Electricity Regulatory Commission (LASERC).
The company is one of 14 licensees recently approved by LASERC, but the only operator cleared under the embedded generation category for a 9MW project in this round.

The facility will serve Isolo and the surrounding areas, supporting Lagos State’s ongoing push to decentralise electricity supply and improve power reliability across industrial and residential corridors.
If completed, residents in the surrounding areas could enjoy 24/7 power.
Isolo Power Gen will develop the 9MW embedded generation facility along 110/114 Apapa-Oshodi Expressway, Isolo, Lagos.
– The project is structured under an embedded generation model, allowing electricity to be generated and supplied directly within a local distribution network to improve reliability for host communities.
– The project will operate at 9MW capacity under an embedded generation framework.
– It is designed to supply Isolo and adjoining areas through a localized distribution system.
Ownership includes Westfield Assets Limited (British Virgin Islands), Camara Exim Limited (British Virgin Islands), Chellarams Plc, and Suresh Chellaram.